Jalan Buroh · Jurong · District 22· Business 2 industrial by Soilbuild
Buroh Connection logo
Buroh Connection, artist's impression: business visitors in the lift lobbyArtist’s impression
Jalan Buroh, District 22

Buroh Connection Location

Buroh Connection sits on Jalan Buroh close to Jurong Pier Road, in the industrial south-west of Jurong, where the Jurong Region Line will meet the waterfront.

Buroh Connection Location and Address

The site is on Jalan Buroh near its junction with Jurong Pier Road, in District 22. The map shows its position against the junction, where Jurong Pier station is being built.

Open in Google Maps

Distances from the site

PlaceFrom the site
Jurong Pier station (JS12), Jurong Region Lineabout 240 m
Jurong Hill station (JS11), Jurong Region Lineabout 550 m
Jurong Island Checkpointabout 590 m
Jurong Port (office, Jurong Port Road)about 1.1 km
Boon Lay MRT station (EW27)about 2.7 km
Pioneer MRT station (EW28)about 2.9 km
Joo Koon MRT station (EW29)about 3.7 km
Jurong East MRT station (EW24 / NS1)about 4.3 km
JEM, Jurong Eastabout 4.4 km
Tuas Checkpoint (Tuas Second Link)about 8.9 km

Straight-line distances from the site, measured on map coordinates; road and walking routes are longer.

Buroh Connection and the Jurong Region Line

The Jurong Region Line is LTA’s seventh MRT line and its first to run on viaducts for its whole length: 24 kilometres and 25 stations through the west, with interchanges at Choa Chu Kang, Boon Lay and Jurong East. Its trains are fully automated three-car sets that can be lengthened to four.

The line opens in three stages. Stages 1 and 2 are expected in 2028; Stage 3, expected in 2029, carries the main branch south to Jurong Pier and west into NTU, adding seven stations. Jurong Pier (JS12) is the southern end of the main branch, and Jurong Hill (JS11) the stop before it.

For Buroh Connection, that means a station about 240 m away, and one change at Boon Lay or Jurong East to reach the East-West and North-South Lines.

Cross Island Line Phase 3

LTA announced the alignment of Cross Island Line Phase 3 on 31 July 2026: about 10 kilometres with four stations, starting from Jurong Lake District. Station CR21 will connect with the Jurong Region Line at JS12, and CR23 with the East-West Line at Gul Circle. Construction is expected to begin in 2027, with stations targeted for the late 2030s.

Buroh Connection by Road, Sea and Border

JTC’s tender brief lists the Ayer Rajah Expressway, Jalan Ahmad Ibrahim and the major arterial roads around the site among its connections, and the Tuas Second Link for direct access to Malaysia. Jurong Pier Road runs north from Jalan Buroh to the AYE interchange near Jurong Hill station.

The Jurong Island Checkpoint, the gateway to the island’s petrochemical and energy cluster, is about 590 m away, and Jurong Port’s office on Jurong Port Road about 1.1 km. Few B2 sites sit this close to both.

Jurong East regional centre

For meetings, banking and dining, the Jurong East regional centre, with JEM beside Jurong East station, is about 4.4 km away, and from 2029 the Jurong Region Line will run directly from Jurong Pier towards it.

The amenities page covers what is around the site day to day, and the transport and logistics guide looks at each route for staff and goods.

Page reviewed .

Priority registration

Register for Buroh Connection

Buroh Connection is Soilbuild’s new Business 2 development at Jalan Buroh. Registered parties hear first as each part of the release is issued, from the e-brochure and floor plans to the price list and the first viewing appointments.

Released to registered parties first

The Sales Concierge
WhatsApp6200 6220
ViewingsShowflat viewings are arranged by appointment through the Sales Concierge.
LocationJalan Buroh, Jurong (District 22)
ZoningBusiness 2 (B2) industrial
Tenure33-year JTC lease
Site area31,151.5 sq m
DeveloperSoilbuild Group Holdings Ltd

Register for Buroh Connection

The Sales Concierge answers every registration personally.

For a direct word with the Sales Concierge, call or WhatsApp 6200 6220.